Service 05
AMR (OSOS / MASS) installation and setup
We install OSOS and MASS metering equipment in the field, set up its communication and commission it.
We take on the field installation and setup of automatic meter reading (OSOS) and MASS metering equipment.
Installation follows the distribution company’s work list; remote reading is verified and recorded.
What we do in the field
MASS meter installation
Remotely readable meters are installed in the field following the list.
Communication setup
The modem and communication unit are installed and the meter's link to the system is set up.
Commissioning and records
Remote reading of the meter is verified and the details recorded.
How we work
List
The list of installation points is received from the distribution company.
Preparation
Crews and equipment are prepared per region.
Installation
The meter and communication unit are installed in the field.
Commissioning
Remote reading is verified and the records passed on.